Douglas County PUD
Fort
Patrick Henry
Project
Plant
size - 48 MW
Publication: HydroVision
'98, Reno, Nevada (PDF format - 99kb)
 |
On-site measurement supervision services, data analysis and a report for Wells Dam for turbine discharge measurements was carried out as a continuation of services by ASL AQFlow for Douglas County PUD #1 that has been carried out each year at different units since 2002. Back |

Wheeler
Project
Plant
size - 404 MW
 |
In
1999, TVA performed comparison discharge testing, using the traditional
array of current meters and the ASFM, for two separate turbine settings.
Upstream obstructions (horizontal beams supporting the trash-racks) resulted
in a high level of turbulence, and the results from the two measurement
methods differed by between 7% and 8%. It is unclear which technology was
more accurate. Back |

| Client |
Project/ Year |
| Electricité de France |
Pinet 2007 |
| |
Cusset 2007 |
| |
La Rance 2007 |
| |
Sisteron 2007 |
|
| |
Kembs - 2006 |
| Douglas County PUD |
Wells 2002,2004,2005,2006 |
| Korea Water Resources Corp. |
Namgang 2006 |
| |
Yongdam 2005 |
| Hydro Québec |
Rocher-de-Grand-Mère 2006 |
| |
La Grande 1, 2003 |
| |
Outardes II, 2002 |
| |
Rapides des Quinze, 2002 |
| |
Coteau Rapids Spillway, 2000 |
| |
Les Cèdres, 2000 |
| |
Laforge-2 - 1997 |
| Portland General Electric |
TW Sullivan - 2005 |
| Edison Sault Electric Company |
2004 |
| US Army Corps of Engineers |
Lower Granite - 1995, 2004 |
Little Goose - 2003 |
Lower Monumental - 2002 |
John Day - 2002 |
The Dalles - 2000, 2001 |
Bonneville - 1998, 1999, 2000 |
McNary - 1998, 1999 |
| Hydro Kennebec |
2003 |
| Nova Scotia Power |
Hells Gate 2002 |
| |
Deep Brook - 2001 |
| BC Hydro |
Stave Falls - 2000 |
Revelstoke - 1996 |
| Chelan County PUD |
Rocky Reach - 1992, 1993, 2000 |
Rock Island- 2000 |
| Swed Power, Sweden |
Mellanfallet - 1999 |
| Manitoba Hydro |
Seven Sisters 1999 |
| Tennessee Valley Authority |
Wheeler - 1999 |
Fort Patrick Henry - 1997 |
Note:
While the first measurement by a particular owner is typically carried out by AQFlow technical personnel, the user-friendly features of the ASFM offer the owners the choice of having the subsequent measurements carried out by AQFlow personnel (indicated above in italics) or by their own personnel (indicated by non-italics).
As shown, Nova Scotia Power, Hydro Québec, Korea Water Resources and Electricité de France have all opted for having their personnel trained by AQFlow technicians as part of the first project, purchasing the ASFM and performing all subsequent measurements in-house successfully and cost-effectively.
|